Stubblefield Bridge finally set to open tomorrow Veterans Day 11/11/21.
- Native Pedal
- Posts: 5
- Joined: Fri May 15, 2015 1:34 pm
Stubblefield Bridge finally set to open tomorrow Veterans Day 11/11/21.
Seems like 11/11/21, Veterans Day, may finally be the day the Stubblefield Bridge reopens. Yesterday they moved out some heavy equipment, their on site fuel storage tank and their chemical toilets. The road stripes are painted and they were cleaning up the site. It was damaged by hurricane Harvey way back in August of 2017.
Re: Stubblefield Bridge finally set to open tomorrow Veterans Day 11/11/21.
Should be good to go here pretty soon. I had some epic white bass fishing from that old bridge.